In 2007 the Council announced its use of composite fibre technology to replace a timber bridge, rather than concrete and steel. The structure of a bridge is pre-cast in a factory and is easier to transport and install.
Pedestrian and cycle bridges could be constructed to give more options to park users. My interest is having extra crossings of Bulimba Creek making it viable to keep more cars off crowded roads.
Scrub Road will be extended by the end of 2009 bringing hundreds more vehicles on to Wecker, Newnham, Ham Roads. Thousands of children attend local schools, recreation and child care facilities.
Keeping hundreds of children off Wecker Road with the installation of safe, visible crossings would also benefit the flow of traffic.
Some children currently avoid Wecker Road by crossing the creek, over stones which is fun but they have to cross the mud under the bridge, frequently painted with disgusting graffiti.
A safe 600 metre walk to school crossing over a creek could make a difference for children who have some time to change their channel if they have had issues at home or school.
AGL had considerable impact on Bulimba Creek to lay their pipeline, so it would be good for them to contribute with a bridge joining Eastwood Drive and the nearby Edwards Park.
Brisbane City Council claims credit for inventing fibre composite technology for bridge building.I have never been able to get them to explain what it means.I suspected it meant using recycled materials to build strong infrastructure cost effectively.If a strategy was in place for construction of pedestrian and bike bridges it would be a wonderful benefit to the community with more options to cross creeks and waterways safely.Bulimba Creek has several historic crossings where a visionary person arranged concrete post as crossings in strategic places.They don't stop the flow of the creek, occasionally would have a build up of debris which slows down the flow of water in flood times. Those who use the creek catchment for recreation would have improved access without environmental impact of making their own crossings.A crossing on Wecker Road could help keep hundreds of children off a chaotic road and benefit from more exercise while walking a few hundred metres to school.Crossings in the Blackberry Street where there are already pipe crossings would disperse the traffic and give more options for the hundreds of park users enjoying their local area.If the bridges were constructed to provide safe access during times of higher water levels it would be a great benefit to the environment and members of the community. Photos to be posted soon